Name: Wayland Circle- Richwood Drive Water Main Replacement Project Type: Water Location: Wayland Circle, Richwood Drive, and Skyland Drive Cost: $1.4M Project Timeframe: October 2017 - March 2018 |
This project will include replacement of water mains in this area that have reached or exceeded their average useful service lives with new pipe along Wayland Circle, Richwood Drive, and Skyland Drive. As part of the project, approximately 7,200 feet of eight-inch ductile iron pipe will be installed, as well as new meters, hydrants and service lines to the new mains. |