Name: Stephenson Creek Interceptor Replacement 

Type: Wastewater

Location: North Goddard Road

Change Order Cost: $6,215,132

Major Gravity Sewer Line Capacity Restoration $7.2M

Substantial Completion: December 2018

Final Completion: April 2019  

The project is to replace approximately 6400 ft. of the existing concrete sewer pipe that the County determined was significantly corroded and structurally deteriorating. It will be replaced with 30-in. ductile iron pipe.  This project is to improve service of the Stephenson Creek Interceptor Replacement Project, the gravity sewer infrastructure leading to the Polebridge Water Treatment Plant.

The project consists of two phases:

  • Phase 1 – Arabia Mountain Park entrance on N. Goddard Road to Rockland Road.
  • Phase 2 – Arabia Mountain Park area
 The third part of the project is investigating the condition of approximately 15,000 feet of the existing gravity sewer starting at North Goddard Road and going through the Arabia Mountain Nature Preserve crossing Browns Mill Road, South Goddard Road and ending at the Pole Bridge Creek Water Treatment Plant.  

 

Upcoming Events

Community Letters 

 

                MultivistaPhoto-2017-04-20 (1)_0.jpg   MultivistaPhoto-2018-01-24.jpg    

Follow DWM on Social: Facebook | Twitter | Youtube

Contact Us:

1-800-986-1108

projectinfo@dekalbcountyga.gov

www.dekalbwatershed.com

Sign up for the DWM Email List!

Consent Decree Outreach DeKalb County Government Department of Watershed Management Office of Engineering & Construction Management Services 1.800.986.1108 (direct) projectinfo@dekalbcountyga.gov | www.dekalbwatershed.com