SDC Construction will manage Area 4: The By Way. Work will include the installation of an 8" ductile iron pipe along the following neighborhood streets: Cameron Court, The By Way, Oxford Road, Briardale Lane and Springdale Road covering approximately 10,925 linear feet (LF). All pipe replacement will be performed in the road.