GS Construction will manage Area 1 on North Decatur Road. Work will include the installation of a 12" ductile iron pipe along N. Decatur Road from Briarcliff Road to Oxford Road covering approximately 4,240 linear feet (LF). An estimated 75 residents will be impacted by the reconstruction process. All pipe replacement work will be performed in the road.