Project Details |
Project Description |
Follow Project Status |
||
Name: St. Patrick Street Water Main Replacement Type: Water Location: St. Patrick Street, Decatur GA Cost: $563,000 Project Timeframe: February 2018-June 2018 (5 months) |
This project will include replacement of water mains in this area that have reached or exceeded their average useful service lives with new pipe along St. Patrick Street and Patrick Court. As part of the project, approximately 3,200 feet of eight-inch ductile iron pipe will be installed, as well as new meters, hydrants and service lines to the new mains. Pipe installations will require excavation of some lawns along the project alignment. Disturbed grass will be replaced with temporary covering directly after pipe installation in January. Yards will be restored to pre-construction conditions with sod or seeded grass comparable to existing varieties in spring as weather conditions and material availability permit |
Fact Sheet Impact Aerial Map Aerial Map FAQs
|
||
Follow DWM on Social: Facebook | Twitter | YoutubeContact Us:1-800-986-1108projectinfo@dekalbcountyga.govwww.dekalbwatershed.comSign up for the DWM Email List! |