Project Details |
Project Description |
Follow Project Status |
||
Name: Hearn Road Lift Station Replacement Type: Wastewater Location: 4317 Hearn Road, Ellenwood GA Cost: $1.8 million Project Timeframe: September 2017- March 2018 (6 months) |
Installation of a 30-foot-deep wet well, new pumps along with a tie-in to existing sewer pipes. |
|
||